2008 Annual Parish Report

Christian Formation

Outreach

Open Door

Sacristan

Stewardship & Property

Music at St. John's

Street Youth Theater Workshopl

Arts Committee

Guild of St. John the Divine

Ushers Committee

Evangelism Committee

x

STEWARDSHIP REPORT

After a downturn in 2008 (perhaps a foreshadowing of the recession), 2009 is showing promise. The number of pledges remained the same despite the loss of 6 pledging units (3 due to moves). Overall pledge income increased 5% to over $123,000. 50% increased their pledges over 2008, while only 20% decreased their pledges. Annual pledges provide almost one third of our annual parish budget, and your generosity this year has helped secure a balanced budget for 2009.

PROPERTY REPORT

St. John’s continues to allocate sufficient resources to address emergencies in its buildings. We are especially grateful to Father Prator for his attention to all our buildings and our beautiful gardens. Thanks are due also to Pat Thompson, Nelson and Harold for their diligence.

There have been a number of plumbing issues but all were addressed in a timely manner.

The red doors on the Waverly Place side were rebuilt and painted along with rotting wooden portions of the roof bulkhead over Wade House.

Thanks to an anonymous parishioner several small repairs were made around the bathrooms, and the foyer and woodwork were painted. (Missing tiles in the foyer will be replaced shortly as matching ones needed to be located.)

Leases have been re-negotiated to generate a bit more income. Many thanks to Pat for doing all of that paper work.

Because of the affect of the economic downturn, we have had to put all projects on hold and take the position of only responding to emergencies. We are, however, working on a fund-raising project specifically for building maintenance.

The projects on hold are:

The Rectory and Wade House need window replacements/repair and pointing and masonry work.

The toilets throughout the plant should be replaced with low-water units to save on water bills.


The Parish Hall kitchen needs an update and new flooring.


The Parish Hall floor needs refinishing.


The Parish Hall needs repainting.


The Choir Loft needs repainting.